Skip to content Skip to footer

Vaishnaw Calls for 25-Year Plan to Link Coastal Karnataka’s Ports and Industry by Rail

Vaishnaw Pushes 25-Year Rail Connectivity Plan

Coastal Karnataka rail connectivity

News: Union Railway Minister Ashwini Vaishnaw called for a 25-year master plan to align railway, port, and industrial development in coastal Karnataka, speaking during a railway connectivity review in Mangaluru on November 13, 2026.

New Mangalore Port Authority Chairman Sushil Kumar Singh pressed for doubling the Mangaluru-Bengaluru line and improving rail links from the port into its inland hinterland.

New Mangalore, Karnataka’s only major port, handled 50.04 million tonnes in FY2025-26, up from 46.01 million tonnes the year before, with crude oil, coal, fertilizers, and edible oil as main imports and petroleum products, iron ore pellets, and containers as main outbound cargo.

A 4,800 sq m covered shed for fertilizers, sugar, and grain opened at the port on November 13. The proposed second rail track would use a gentler gradient through the Western Ghats; the final location survey is complete and a detailed project report was discussed at the review. Electrification of the existing ghat section is already finished, and a separate step toward integration, merging Konkan Railway Corporation with Indian Railways, still needs consent from Karnataka, Kerala, Goa, and Maharashtra, which hold stakes in the corporation.

For shippers using New Mangalore Port, a second track and a long-term planning framework would address a rail bottleneck through the ghat section that currently constrains how much cargo can move between the coast and Karnataka’s industrial interior, though no funding figures or construction timeline have been announced yet.